Originally Posted by AlexsMom
I know it's not meant to be taken literally, but if he told a builder to "build it the way I want it" with no particular due date, then sprang a due date on the builder at the last minute, he'd have a house that was neither what he wanted, nor finished in the time frame he hoped.
lol! I wish that I had been fast enough thinking to tell him that when he gave me said analogy. Thanks for the laugh, though smile.